Solar Plant SCADA Systems and Integration
Inelso provides turnkey services for integration with EDAŞ SCADA system, including supply of materials compliant with relevant specifications and regulations, SCADA panel manufacturing, installation, commissioning and Point-to-Point (PTP) testing. We also provide technical support services such as correction and software updates for non-functioning SCADA infrastructures.
Successfully integrated 849 SPP, 11 HPP, 5 WPP and 1164 distribution SCADA systems, ensuring 99.9% data transmission success rate.
We manage the entire process from SCADA system installation to commissioning, from protocol integration to data transfer testing. Ensuring full compatibility with IEC 60870-5-104, IEC 61850, Modbus and DNP3 protocols, we install systems 100% compliant with EMRA and TEDAŞ requirements. We guarantee uninterrupted data flow and remote management throughout your plant’s entire lifespan.
As Inelso Energy, our core capabilities in plant SCADA systems:
- Full compatibility with IEC 60870-5-104, IEC 61850, Modbus protocols
- PTP testing, commissioning and 24/7 technical support services
- Turnkey SCADA panel manufacturing and installation compliant with EDAŞ specifications
Why is SCADA integration required?
According to EMRA and TEDAŞ regulations, plants 1 MW and above must be connected to EDAŞ SCADA system. Through SCADA, plant data is transmitted to the center in real-time, enabling remote control and monitoring.
How long does SCADA installation take?
From panel manufacturing to commissioning, it takes an average of 4-6 weeks. PTP testing and EDAŞ approval process are included. Accelerated installation is possible for urgent cases.
Which protocols are supported?
IEC 60870-5-104 (main protocol), IEC 61850, Modbus TCP/RTU, DNP3 protocols are supported. Compliant with all requirements of TEDAŞ and regional distribution companies.
Our existing SCADA system is not working, what should we do?
Inelso performs diagnosis, repair and software updates for faulty SCADA systems. Missing protocol integrations are completed, PTP tests are renewed. Systems are typically activated within 1-2 weeks.