Our Solutions

Solar Plant SCADA Systems and Integration

Inelso provides turnkey services for integration with EDAŞ SCADA system, including supply of materials compliant with relevant specifications and regulations, SCADA panel manufacturing, installation, commissioning and Point-to-Point (PTP) testing. We also provide technical support services such as correction and software updates for non-functioning SCADA infrastructures.

Successfully integrated 849 SPP, 11 HPP, 5 WPP and 1164 distribution SCADA systems, ensuring 99.9% data transmission success rate.

We manage the entire process from SCADA system installation to commissioning, from protocol integration to data transfer testing. Ensuring full compatibility with IEC 60870-5-104, IEC 61850, Modbus and DNP3 protocols, we install systems 100% compliant with EMRA and TEDAŞ requirements. We guarantee uninterrupted data flow and remote management throughout your plant’s entire lifespan.

Our Service Process

As Inelso Energy, our core capabilities in plant SCADA systems:

  • Full compatibility with IEC 60870-5-104, IEC 61850, Modbus protocols
  • PTP testing, commissioning and 24/7 technical support services
  • Turnkey SCADA panel manufacturing and installation compliant with EDAŞ specifications
Inelso Energy Our Solutions Scada Systems
Inelso Energy Our Solutions Scada Systems
Why is SCADA integration required?

According to EMRA and TEDAŞ regulations, plants 1 MW and above must be connected to EDAŞ SCADA system. Through SCADA, plant data is transmitted to the center in real-time, enabling remote control and monitoring.

How long does SCADA installation take?

From panel manufacturing to commissioning, it takes an average of 4-6 weeks. PTP testing and EDAŞ approval process are included. Accelerated installation is possible for urgent cases.

Which protocols are supported?

IEC 60870-5-104 (main protocol), IEC 61850, Modbus TCP/RTU, DNP3 protocols are supported. Compliant with all requirements of TEDAŞ and regional distribution companies.

Our existing SCADA system is not working, what should we do?

Inelso performs diagnosis, repair and software updates for faulty SCADA systems. Missing protocol integrations are completed, PTP tests are renewed. Systems are typically activated within 1-2 weeks.

Our Integration Process
1

SCADA Panel Design and Manufacturing

SCADA panel design, manufacturing compliant with EDAŞ specifications and CE certified equipment supply.
2

Protocol Integration and Software

IEC 60870-5-104, IEC 61850, Modbus protocol configuration and data mapping performed.
3

Installation and Field Setup

SCADA panel installation, cabling and equipment connections performed at plant site.
4

PTP Testing and Commissioning

Point-to-Point communication testing, data verification, EDAŞ-approved commissioning.
5

Existing System Correction and Update

Repair of faulty SCADA systems, software updates and performance improvement provided.
6

Technical Support and Maintenance Service

24/7 remote support, annual maintenance, protocol updates and fault intervention service provided.
Cart (0 items)
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare